Statutory Instrument 2005 No. 2721The London Thames Gateway Development Corporation (Planning Functions) Order 2005(The document as of February, 2008) STATUTORY INSTRUMENTS2005 No. 2721URBAN DEVELOPMENTThe London Thames Gateway Development Corporation (Planning Functions) Order 2005
The First Secretary of State, in exercise of the powers conferred on him by section 149 (1), (3), (11) and (13) of the Local Government, Planning and Land Act 1980[1], and of all other powers enabling him in that behalf, makes the following Order: Citation and commencement 1.This Order may be cited as the London Thames Gateway Development Corporation (Planning Functions) Order 2005 and shall come into force on 31st October 2005. Interpretation 2.In this Order—
Planning functions area
(b) development which comprises or includes the provision of 2,500 or more square metres of floorspace where the development is not solely for houses, flats or houses and flats; (c) development which occupies 1 hectare or more of land; (d) development which comprises or includes the provision of buildings which are 25 metres or more in height; (e) development which comprises or includes the winning and working of minerals in, on or under land, whether by surface or underground working; (f) development to provide an installation for, or designed to be used wholly or mainly for the purposes of, waste development; (g) development which comprises or includes a generating station with an output of 0.5 or more megawatts; (h) development for a use, other than residential use, which includes the provision of 50 or more car parking spaces; (i) development—
(ii) which would involve the construction of a building with 500 or more square metres of floorspace, or a material change in the use of such a building; (j) development to provide or extend—
(ii) a heliport (including a floating heliport and a helipad on a building); (iii) an air passenger terminal at an airport; (iv) a railway station; (v) a tramway, an underground, surface or elevated railway, or a cable car; (vi) a bus or coach station; (vii) a crossing over or under the River Thames, the River Lea and associated waterways, or the River Roding; or (viii) a pier on the River Thames; (k) development which is likely to result in the loss of 20 or more houses, flats or houses and flats (irrespective of whether the development would also entail the provision of new houses or flats);
(ii) is on land which has been—
(bb) allocated for use as a playing field in a development plan or in proposals for a for such a plan or its alteration or replacement; (m) development which is not of a kind specified in any of the preceding sub-paragraphs but which forms part of more substantial proposed development of such a kind on the same land or adjoining land in the planning functions area. (2) In deciding whether development forms part of more substantial development, there shall be taken into account other development of the same land or adjoining land in the designated area—
(b) in respect of which planning permission has been granted within the period of five years immediately preceding that date; or (c) which has been substantially completed within the period of five years immediately preceding that date. (3) For the purposes of this article—
(b) "floorspace" shall be calculated by external measurement; (c) "generating station" has the same meaning as in Part 1 of the Electricity Act 1989[7]; (d) "playing field" has the same meaning as in article 10(2)(l) of the GDPO; and (e) "waste development" means any operational development designed to be used wholly or mainly for the purpose of, or a material change of use to, treating, keeping, processing, recovering or disposing of refuse or waste materials. Additional functions conferred on the development corporation
(b) was duly made before this Order came into force to an authority which ceases by virtue of section 7 of the 1990 Act and the preceding provisions of this Order to be the local planning authority responsible for determining the application ("the previous authority"); and (c) has not been determined when this Order comes into force. (2) Subject to paragraph (3), the previous authority may—
(b) with the written agreement of the applicant, transmit any such application to the development corporation for determination. (3) If any such application is subject to a direction made under article 14 of the GDPO (directions by the Secretary of State), the previous authority shall transmit it to the development corporation no later than 10 days after the day on which the direction is made.
(b) that authority consider that the application is for development of a kind specified in article 4(1); that authority shall transmit the application to the development corporation for determination.
(b) shall notify the development corporation of the appeal and transmit to the First Secretary of State any representation received from the development corporation. Transitional provision: compensation
(ii) on a reference made to him by such authority; and (b) that determination gives rise to a right to compensation, that authority shall be liable to pay the compensation.
(b) serves a notice under section 185 of that Act in respect of such a matter, the authority which was the local planning authority in relation to that land when the matter arose shall remain liable to pay any compensation arising from the order or notice.
(This note is not part of the Order) The London Thames Gateway Development Corporation (the corporation) was established by the London Thames Gateway Development Corporation (Area and Constitution) Order 2004 (S.I. 2004/1642) for the purpose of regenerating the London Thames Gateway urban development area. This Order describes, with the use of maps, the portions of the urban development area in which this Order confers planning functions on the development corporation ("the planning functions areas")(article 3). This Order makes the corporation the local planning authority in the planning functions area in relation specified kinds of development for the purposes of Part 3 of the Town and Country Planning Act 1990 (control over development) (article 4). It also confers on the corporation the functions of the Planning (Listed Buildings and Conservation Areas) Act 1990 which are specified in Part 1 of Schedule 29 to the Local Government, Planning and Land Act 1980 as are set out in the table in the Schedule to this Order (article 5). The Order applies other provisions of the 1990 Acts specified in Part 2 of Schedule 29 to the 1980 Act to the corporation and to the area, subject to the modifications set out in that Part (article 6). Provision is made so that the former local planning authority may determine applications received but not determined by it prior to the date on which this Order comes into force but may transmit them to the corporation for determination with the agreement of the applicant, and must transmit them in a case where the Secretary of State has made a direction under article 14 of the Town and Country Planning (General Development Procedure) Order 1995 (article 7). Provision is also made to leave responsibility for the payment of compensation under section 107, 108 or 115 of the Town and Country Planning Act 1990 or section 28 or 29 of the Planning (Listed Buildings and Conservation Areas) Act 1990 with the local planning authority who took the action giving rise to a right to compensation (article 8). Prints of the maps referred to in article 3 of this Order are available for inspection at all reasonable hours in the Library of the Office of the Deputy Prime Minister, Ashdown House, 123 Victoria Street, London SW1E 6DE. The maps are also available at the offices of the London Borough of Barking, Planning and Transportation Department, Third Floor, Ripple Municipal Offices, 127 Ripple Road, Barking, IG11 7PB; the London Borough of Hackney, Planning Department, Dorothy Hodgkin House, 12 Reading Lane, London, E8 1HJ; the London Borough of Havering, Planning Department, 7th Floor, Mercury House, Mercury Gardens, Romford, RM1 3SL; the London Borough of Newham, Development Control, Town Hall Annexe, Barking Road, East Ham, London, E6 6EH; the London Borough of Tower Hamlets, Planning Department, Town Hall, Mulberry Place, 5 Clove Crescent, London, E14 2BG; and the London Thames Gateway Development Corporation, 9th Floor, South Quay Plaza 3, 189 Marsh Wall, London E14 9SH. A regulatory impact assessment was prepared in relation to the London Thames Gateway Development Corporation (Area and Constitution) Order 2004 and is available on the internet at www.odpm.gov.uk.. Alternatively copies can be obtained by post from the Office of the Deputy Prime Minister, Zone 4/G10, Eland House, Bressenden Place, London SWIE 5DU. An additional regulatory impact assessment has not been prepared for this instrument as it has no additional impact on business, charities or voluntary bodies. Notes: [1]1980 c.65; section 149 was amended by Schedule 1 to, and paragraph 44(6) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c.11). There are other amendments not relevant to this Order. See also section 7 of the Town and Country Planning Act 1990 (c.8).back [2]1990 c.8.back [3]1990 c.9.back [4]S.I. 1995/419; a relevant amending instrument is S.I. 1996/1817.back [5]S.I. 2004/1642.back [6]See article 3 of S.I. 2004/1642.back [7]1989 c. 29. Relevant amendments were made by the Energy Act 2004 (c. 20), section 89.back [8]Part 1 of Schedule 29 was amended by paragraph 44(12) of Schedule 2 to the Planning (Consequential Provisions) Act 1990 (c. 11), and by paragraph 17 of Schedule 3 to, and paragraph 5 of Schedule 7 to, the Planning and Compensation Act 1991 (c. 34).back [9]Part 2 of Schedule 29 was amended by paragraph 44(13) of Schedule 2 to the Planning (Consequential Provisions) Act 1990.back [10]Section 78 was amended by section 17(2) of the Planning and Compensation Act 1991.back [11]Section 107 was amended by paragraph 8 of Schedule 1 to, and paragraph 13 of Schedule 6 to, the Planning and Compensation Act 1991.back [12]Section 100 was amended by paragraph 5 of Schedule 1 to the Planning and Compensation Act 1991.back ISBN0 11 073407 6 -- Back --