Statutory Instrument 2001 No. 4038The River Thames (Hungerford Footbridges) (Variation) Order 2001(The document as of February, 2008) STATUTORY INSTRUMENTS2001 No. 4038TRANSPORT AND WORKS, ENGLANDThe River Thames (Hungerford Footbridges) (Variation) Order 2001
Whereas an application has been made to the Secretary of State in accordance with the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2000[1] made under sections 6, 6A 7 and 10 of the Transport and Works Act 1992[2] ("the Act"), for an Order under section 3 of the Act; And whereas the Secretary of State is satisfied that the provision of an alternative right of way for each of the streets mentioned in Part II of Schedule 4 to the River Thames (Hungerford Footbridges) Order 1999 as substituted by paragraph 2 of Schedule 1 to this Order is not required; And whereas the Secretary of State has determined to make an Order giving effect to the proposals contained in the application with modifications which in his opinion do not make any substantial change in the proposals; And whereas the Secretary of State is of the opinion that the primary object of this Order cannot be achieved by means of an Order under the Harbours Act 1964[3]; And whereas notice of the Secretary of State's determination was published in the London Gazette on 19th November 2001; Now, therefore, the Secretary of State in exercise of the powers conferred on him by sections 3 and 5 of, and paragraphs 1, 2, 4 and 8 of Schedule 1 to, the Act and by the Transport and Works (Description of Works Interfering with Navigation) Order 1992[4] and all other powers enabling him in that behalf, hereby makes the following Order - Citation and commencement 1.This Order may be cited as the River Thames (Hungerford Footbridges) (Variation) Order 2001 and shall come into force on 11th December 2001. Interpretation 2. - (1) In this Order -
(2) Except as provided by the terms of this Order any expression used in the Principal Order shall have the same meaning in this Order as in the Principal Order. Variations of the Principal Order 3. - (1) The Principal Order is amended in accordance with Schedule 1 and Schedule 2 to this Order. (2) The substituted plans and substituted sections are substituted for, respectively, the plans referred to in the Principal Order as the Works Plan and the Footpath Plan and the deposited sections certified under the names Upstream and Downstream Long Sections and Bridge Sections as deposited sections for the purposes of the Principal Order and all references in the Principal Order to the Works Plan and the Footpath Plan and the deposited sections so certified shall be construed as if reference were made in the Principal Order to the substituted plans and substituted sections. Certification of plans, etc. 4.The undertaker shall, as soon as practicable after the making of this Order, submit copies of the substituted plans and the substituted sections to the Secretary of State for certification that they are true copies of, respectively, the substituted plans and the substituted sections referred to in this Order; and a document so certified shall be admissible in any proceedings as proof of the contents of the document of which it is a copy. Signed by authority of the Secretary of State for Transport, Local Government and the Regions Ellis Harvey Head of the Transport and Works Act Processing Unit, Department for Transport, Local Government and the Regions 20th November 2001 1.In article 4 of the Principal Order (Power to deviate) for sub-paragraph (b) there shall be substituted -
(ii) to any such extent downwards as may be necessary or convenient but subject to the consent in writing of the Port Authority; and (iii) in constructing the pylons and cable stays and other associated structures comprised in the scheduled works on the Middlesex Pier of the Charing Cross Railway Bridge and Victoria Embankment, to any extent not exceeding 2 metres upwards". 2.For Schedule 4 substitute the following -
Note: The references in this Part of this Schedule to "Area" with a number shall be construed as references to land shown upon the deposited plan entitled "Footpath Plan" identified by that number.
1.After article 7 (Temporary stopping up of streets) of the Principal Order there shall be inserted -
7A. - (1) The undertaker may alter the layout of any street specified in columns (1) and (2) of Schedule 5A to this Order in the manner specified in relation to that street in column (3) of that Schedule. (2) Without prejudice to the specific powers conferred by paragraph (1) above but subject to paragraph (3) below, the undertaker may for the purpose of constructing, maintaining or using the scheduled works alter the layout of the street in or adjacent to which the works are situated; and without prejudice to the generality of the foregoing, the undertaker may -
(b) alter the level of any such kerb, footway, cycle track or verge within the street; (c) reduce the width of the carriageway of the street by increasing the width of any kerb, footway, cycle track or verge within the street; and (d) reposition any works in the carriageway of the street which provide places of refuge for the protection of pedestrians crossing that carriageway or other structures within the street. (3) The powers in paragraph (2) above shall not be exercised without the consent of the street authority, but such consent shall not be unreasonably withheld." 2.After Schedule 5 of the Principal Order (Streets to be temporarily stopped up) there shall be inserted - Note: The references in this Schedule to "Area" with a number shall be construed as references to the land shown upon the deposited plan entitled "Footpath Plan" identified by that number.
(This note is not part of the Order) This Order authorises the variation of certain provisions of the River Thames (Hungerford Footbridges) Order 1999 ("the Principal Order") which authorised the construction of two new footbridges on either side of the Hungerford Railway Bridge linking Charing Cross and the South Bank. The Order authorises the relocation and redesign of the supporting pylons of the footbridges from the Middlesex Pier of the Railway Bridge to Victoria Embankment and an increase in the height of the pylons. It also makes provision for changes to the layout of streets and stopping-up of streets consequent upon the redesign of the pylons. The Order varies the Principal Order and substitutes plans and sections for those deposited with the Principal Order. Plans and sections substituted by this Order together with the plans and sections deposited pursuant to the Principal Order may be inspected at Westminster City Hall, Westminster, 64 Victoria Street, London SW1E 6QP between the hours of 9.00 and 5.00 pm Mondays to Fridays excluding public holidays. Notes: [1] S.I. 2000/2190.back [2] 1992 c. 42.back [3] 1964 c. 40.back [4] S.I. 1992/3230. This Order was amended by S.I. 1997/2906 but those amendments are not relevant for the purposes of this Order.back [5] S.I. 1999/2981.back ISBN 0 11 039085 7 -- Back --