Statutory Instrument 1999 No. 391The Channel Tunnel Rail Link (Nomination) Order 1999(The document as of February, 2008) STATUTORY INSTRUMENTS1999 No. 391The Channel Tunnel Rail Link (Nomination) Order 1999
The Secretary of State for the Environment, Transport and the Regions, in exercise of the powers conferred by section 34(1) and (4) of the Channel Tunnel Rail Link Act 1996[1], and of all other powers enabling him in that behalf, hereby makes the following Order: Citation and commencement 1.This Order may be cited as the Channel Tunnel Rail Link (Nomination) Order 1999, and shall come into force on the day after the day on which it is made. Interpretation 2.In this Order-
(b) such parts of the works comprised within works Nos. 4A, 4J, 4K, 4L or 5R as are indicated in blue on the drawings marked "The Channel Tunnel Rail Link (Nomination) Order 1999; drawing no. 1" and "The Channel Tunnel Rail Link (Nomination) Order 1999; drawing no. 2", signed by authority of the Secretary of State for the Environment, Transport and the Regions, dated 18th February 1999 and deposited in the Information Centre, Department of the Environment, Transport and the Regions, Great Minster House, 76 Marsham Street, London SW1P 4DR. (c) such of Work No. 10 as lies to the north of the southern boundary of the A2 road, and (d) the works authorised by paragraph 5 of Schedule 2 to the Act;
(b) such of Work No. 10 as is not comprised in the northern works. Appointment of nominated undertakers
(b) the purposes of any other provision of Part I of the Act except section 14, so far as connected with or in any way relating to those works; and (c) the purposes of section 14 of the Act, so far as concerns the provision of any services in connection with the construction or maintenance of those works. (2) Union Railways (South) Limited shall be the nominated undertaker for-
(b) the purposes of any other provision of Part I of the Act except section 14, so far as connected with or in any way relating to those works; and (c) the purposes of section 14 of the Act, so far as concerns the provision of any services in connection with the construction or maintenance of those works. (3) Paragraphs (1) and (2) have effect in relation to the shared works so that each of Union Railways (North) Limited and Union Railways (South) Limited is (and acts as) nominated undertaker on its own account, so that no act by one shall render the other liable in respect of it.
(b) any request for consent or approval has been made (whether or not it has been determined) or other thing done by Eurostar under the Act in connection with or relating to those works, it shall have effect as if given by or to, made or done by or determined in respect of the relevant transferee. The following are the Thameslink Completion works: The fitting out (but not construction) of the structure of the station tunnel on the Midland City Line (Thameslink) beneath St. Pancras Station, comprised in Work No. 2, including platforms, lifts, escalators, station services and surface finishes. The fitting out (but not construction) of the structure of the western stairwell, the underpass and the low level concourse for that station tunnel, including lifts, escalators, services and surface finishes. The installation of new signalling and electrification for that station tunnel. The installation of permanent way, walkways, electrification, signalling and control equipment within (but not construction of) the bored tunnels, cut and cover boxes and retained cuts that make up the link, comprised in Works Nos. 2A, 2AA, 2B and 2BB, from the Midland City Line (Thameslink) to the Great Northern Suburban Line, together with the Copenhagen Tunnel crossover comprised in Work No. 2C and the junction connections to the Great Northern Suburban Line, junction connections to the Midland City Line (Thameslink) and associated formation and track laying for the connection of the Midland City Line (Thameslink) to the Great Northern Suburban Line. (This note is not part of this Order) This Order specifies Union Railways (South) Limited as the nominated undertaker for the purposes of certain of the provisions of Part I of the Channel Tunnel Rail Link Act 1996 in relation to the part of the rail link between Fawkham Junction, Kent and the Channel Tunnel, and specifies Union Railways (North) Limited as the nominated undertaker for those purposes for most of the remainder of the rail link. Railway sidings at Hoo Sidings and Richborough Sidings, Kent, which are required for construction purposes, are specified as shared works which either may construct or maintain. It also revokes the nomination of Eurostar (U.K.) Limited under the Channel Tunnel Rail Link (Nomination) Order 1997 and transfers that company's rights and liabilities under the 1996 Act in relation to the rail link to the new nominated undertakers. Notes: [1] 1996 c. 61.back [2] S.I. 1997/9.back ISBN 0 11 082054 1 -- Back --