| PART I: INTERPRETATION AND APPLICATION |
| 1. | Citation, commencement and interpretation. |
| 2. | Application. |
| PART II: APPROVED DOCUMENT |
| 3. | Approved Document. |
| 4. | Duties in relation to the Approved Document. |
| PART III: APPROVALS |
| 5. | Approval of design for special form radioactive material. |
| 6. | Approval of Type B(U) package designs. |
| 7. | Approval of Type B(M) package designs. |
| 8. | Approval of package designs for fissile material. |
| 9. | Saving and transitional provision for designs approved under earlier international regulations or under previous regulations. |
| 10. | Approval of shipments under special arrangement. |
| 11. | Approval of other shipments. |
| PART IV: PACKAGING REQUIREMENTS |
| 12. | Quality assurance programmes. |
| 13. | Testing. |
| 14. | Notification and registration of serial numbers. |
| 15. | Package inspection prior to shipment. |
| 16. | Notification of shipment. |
| PART V: GENERAL CARRIAGE PROHIBITIONS AND OPERATING REQUIRE MENTS |
| 17. | General prohibitions. |
| 18. | Suitability of freight containers, tank containers, tank wagons and wagons. |
| 19. | Contents limits. |
| 20. | Transport Index limits. |
| 21. | Activity limits. |
| 22. | Radiation level limits. |
| 23. | Contamination level limits. |
| 24. | Carriage in tanks. |
| 25. | Prohibition on over-filling tank containers and tank wagons. |
| 26. | Openings, valves and caps of tank containers and tank wagons to be securely closed. |
| 27. | Carriage in bulk. |
| PART VI: LOADING AND UNLOADING |
| 28. | Prohibition of mixed loading and segregation of radioactive material. |
| 29. | Loading, stowage and unloading of radioactive material. |
| PART VII: SECURITY MEASURES AND EMERGENCY ARRANGEMENTS |
| 30. | Safe carriage and security. |
| 31. | Marshalling and formation of trains. |
| 32. | Prevention of fire, explosion and leakage. |
| 33. | Emergency arrangements. |
| PART VIII: INFORMATION |
| 34. | Information to be displayed during carriage. |
| 35. | Information to be compiled and provided by consignors. |
| 36. | Carriage Information to be provided by operators. |
| 37. | Keeping of Carriage Information. |
| 38. | Keeping of other information. |
| 39. | Information, instruction and training for train crews and other persons connected with the carriage of radioactive material. |
| PART IX: MISCELLANEOUS |
| 40. | Evaluation of radiation emissions. |
| 41. | Exemption certificates. |
| 42. | Defence. |
| 43. | International provisions. |
| 44. | Transitional defence. |
SCHEDULES
|
|
| | Schedule 1. | Competent authority identification marks. |
|
| | Schedule 2. | Application for approval of special form radioactive material. |
|
| | Schedule 3. | Application for approval of Type B(U) package design. |
|
| | Schedule 4. | Application for approval of Type B(M) package design. |
|
| | Schedule 5. | Application for approval of package design for fissile material. |
|
| | Schedule 6. | Application for approval of shipment under special arrangement. |
|
| | Schedule 7. | Application for approval of shipment. |
|
| | Schedule 8. | Package inspection requirements prior to first shipment. |
|
| | Schedule 9. | Package inspection requirements prior to any shipment. |
|
| | Schedule 10. | Notification of shipment to competent authority. |
|
| | Schedule 11. | Radiation level limits for consignments under exclusive use. |
|
| | Schedule 12. | Loading, stowage and unloading of radioactive material. |
|
| | Schedule 13. | Information to be displayed during carriage. |
| | Part I | Packages and overpacks. |
| | Part II | Freight containers, tank containers, tank wagons and wagons. |
| | Part III | Symbols, signs and panels. |
|
| | Schedule 14. | Carriage Information. |