Navigation
News
|
 |
Statutory Instrument 1993 No. 3260
The London Borough of Hackney (Lea Bridge-Cycle/Footbridge) Scheme 1993 Confirmation Instrument 1993
(The document as of February, 2008)
-- Back --
STATUTORY INSTRUMENTS
1993 No. 3260
HIGHWAYS, ENGLAND AND WALES
The London Borough of Hackney (Lea Bridge-Cycle/Footbridge) Scheme 1993 Confirmation Instrument 1993
The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980[1], and now vested in him[2], and of all other enabling powers: 1. The London Borough of Hackney (Lea Bridge-Cycle/Footbridge) Scheme 1993 is hereby confirmed with modifications. 2. The said Scheme as confirmed (hereinafter referred to as "the Scheme") is set out in the Schedule hereto and copies of the Scheme with its accompanying plans are deposited at the offices of the Department of Transport, 43 Marsham Street, London SW1P 3PY and at the offices of the Directorate of Legal Services, London Borough of Hackney, 298 Mare Street, Hackney, London E8 1HE. 3. The Scheme will become operative on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980. 4. This Instrument may be cited as the London Borough of Hackney (Lea Bridge-cycle/Footbridge) Scheme 1993 Confirmation Instrument 1993. Signed by authority of the Secretary of State for Transport
B. H. Leonard
Regional Director Northern Region Department of Transport
22nd December 1993
Notes:[1] 1980 c. 66.
[2] S.I. 1981/238.
-- Back --
|  |